Coaching practices for Survivability in Planning

Describe almost anything you are working through and IX Coach finds the practices whose real-world fit is closest. For Survivability in Planning, these are the strongest matches in the current practice library.

Does this sound like the set of challenges you might be facing?

  • My plans hold up fine until something throws them off
  • I get swept up in how big the win could be and barely glance at what happens if it goes wrong
  • My whole plan is a chain where every link has to hold
  • I’m all-in on this plan and can barely make myself imagine it going wrong
  • When I ask myself "what could go wrong with this plan," I either draw a blank or come up with one vague worry

Practices that may help

  1. Plan for obstacles with coping plans
    Anticipate the specific obstacles most likely to block your plan and pre-decide your response to each.
    Action Planning
  2. Protect the downside before chasing the upside
    Ask what the worst realistic outcome is and ensure you can survive it before evaluating the upside.
    Margin of Safety
  3. Design decisions so they work even if some things go wrong
    Ask: does this plan require everything to go right? If so, redesign it.
    Margin of Safety
  4. Run a pre-mortem from the outside-view perspective
    Imagine the project has failed — then ask which base-rate failure type caused it.
    The Outside View
  5. Run the basic pre-mortem
    Assume the plan failed, then have everyone write down why.
    The Pre-Mortem: Imagine It Already Failed
  6. Name the assumptions that must hold for the plan to work
    Every plan rests on assumptions — list them and ask how likely each one is.
    Margin of Safety
  7. Build plans with slack for outcomes outside your model
    Reserve capacity for events that are not in your risk model — because the most damaging events usually aren’t.
    The Ludic Fallacy: When You Mistake Real Life for a Game
  8. Run a pre-mortem before committing to a plan
    Imagine the plan has already failed and ask what went wrong.
    Confirmation Bias: Seeing What You Expect to See
  9. Separate the planning session from the execution day
    Do your planning in a dedicated session, never on the day you intend to start.
    The Planning Fallacy — Why Your Estimates Are Always Wrong
  10. Run a premortem before committing
    Imagine the project has already failed and work backwards to find why.
    The Planning Fallacy — Why Your Estimates Are Always Wrong

Related concerns

Describe your situation in your own words to search the complete practice library.

Practice this with IX Coach

Try this practice